Arvind Kejriwal to Regularize Rs.20,000 Cr DISCOM Loot
April17, 2015 (C) Ravinder Singh ravinderinvent@gmail.com
It is very TRAGIC is to Regularize DISCOM LOOT – Under Declaring of Loss Reduction When Tarif was increased by 80% in 2 years ahead of Transfer of Control, They hired recovery agents to Recover Outstanding Dues, Slow Meters Were Net Fast, Billing Efficiency Was Over 100%, within 3 months, Installed FAST Electronic Meters in 2-3 years, Didn’t Provide Uninterrupted Power Meant Consumers Continued to INVEST in INVERTORS & GENERATORS, Supplied Power at up to 247V and 98% Power Factor at tail end Driving 20% more Power, Load Shedding Policy to DISCONNECT Grid than few 100KW plus Loads etc, not Promoting Rooftop Solar, and LED, BRPL Buying 12 BU when consumers are billed 8 BU but require just 5 BU if BRPL provides Uninterrupted Power at 220V-230V at 0.85 Load Factor. Net Loss to Delhi residents is Rs.50,000 crores. FE Story attached.
I Can’t Believe This Can Happen in any Civilized Society.
AAP is unable to Come Up with Policies to CLEAN Delhi Air, Water, Remove Congestions on Roads for Smooth and Fast and Low Pollution Transport.
Actually I hand delivered Petitions to his Office before he resigned earlier as CM and is on my mailing list since 2004.
Ravinder Singh, Inventor & Consultant, INNOVATIVE TECHNOLOGIES AND
No comments:
Post a Comment